top of page
Station 9 (B)
Station Designation:
Address/Cross Street:
Architect:
Builder:
Construction Began:
Construction End:
Date Opened:
Date Closed:
Number of Bays:
Apparatus Stationed:
Auditor Site Link 1:
Auditor Site Link 2:
Service Status:
Structure Status:
Station 9 (B)
1624 E. Midlothian Blvd, Youngstown, Ohio 44502 (Between I-680 and Louise Dr)
Strollo Architects
Murphy Contracting Company
August 28, 2013
March 2, 2014
March 3, 2014
2
Engine 9, Spare Engine 5
Open
Still Standing
Additional Information:
Station replaced the Station 9 (A). Adjacent to Pine Hollow Park.
Station 9 Design Blueprints
Station 9 Construction Photos
2014-03-05 - Station 9 Dedication
Page last updated on
July 17, 2020 at 4:21:50 AM
bottom of page